Sparrow Risk Management Pvt. Ltd.

  • About us
    • About Sparrow RMS
    • Vision & Mission
  • Safety & Risk Management Services
    • Safety and Risk Management
      • Process Safety
      • Electrical Safety
      • Fire Safety
      • Construction Safety
    • Electrical System Design Review
      • Overview
      • Load Flow Analysis
      • Fault Level Calculation
      • Relay Coordination
      • Arc flash studies
      • NFPA 70 E Verification
      • E-HAZOP
    • Energy and Power Quality
      • End to end solution
      • Infra audit
      • Energy audit
      • Power Quality
    • Safety Engineering Review
      • Lightning protection Design
      • Electrical System design
  • Detailed Engineering Services
    • Green Field Projects
      • Overview
      • Conceptulization
      • Pre Detailed Engineering
      • Detailed Engineering
    • Brown field Projects
      • Overview
      • Conceptulization
      • Pre Detailed Engineering
      • Detailed Engineering
      • Power System Analysis
    • Merger & Acquisition
  • Case Study
    • IS 17893-Work Permit System
  • Training & E-Learning
    • HSE Induction
    • Managing HSE workshop
    • Manage Safety Training
    • First Aid Training
    • Electrical Safety Training
    • Arc Flash Training
    • HAZOP Training
    • Road Safety Training
    • Fire Safety Training
    • Job Safety Analysis Training
    • Accident Investigation
    • Risk Assesment
    • Thermography Training
  • Major Clients
  • Career
    • Current Openings
  • Contact us
    • Corporate Office
    • Business Query
Menu
  • Home
  • About us
    • About Sparrow RMS
    • Vision & Mission
  • Safety & Risk Management Services
    • Safety and Risk Management
      • Process Safety
      • Electrical Safety
      • Fire Safety
      • Construction Safety
    • Electrical System Design Review
      • Overview
      • Load Flow Analysis
      • Fault Level Calculation
      • Relay Coordination
      • Arc flash studies
      • NFPA 70 E Verification
      • E-HAZOP
    • Energy and Power Quality
      • End to end solution
      • Infra audit
      • Energy audit
      • Power Quality
    • Safety Engineering Review
      • Lightning protection Design
      • Electrical System design
  • Detailed Engineering Services
    • Green Field Projects
      • Overview
      • Conceptulization
      • Pre Detailed Engineering
      • Detailed Engineering
    • Brown field Projects
      • Overview
      • Conceptulization
      • Pre Detailed Engineering
      • Detailed Engineering
      • Power System Analysis
    • Merger & Acquisition
  • Case Study
    • IS 17893-Work Permit System
  • Training & E-Learning
    • HSE Induction
    • Managing HSE workshop
    • Manage Safety Training
    • First Aid Training
    • Electrical Safety Training
    • Arc Flash Training
    • HAZOP Training
    • Road Safety Training
    • Fire Safety Training
    • Job Safety Analysis Training
    • Accident Investigation
    • Risk Assesment
    • Thermography Training
  • Contact us
    • Corporate Office
    • Business Query
  • Query

Services

  • Safety and Risk Managment
    • Process Safety
      • Overview
      • HAZOP
      • HAZID
      • HIRA
      • QRA
      • Disaster managment
      • Accident Investigation
      • Fire gas detector mapping
    • Electrical Safety
      • Overview
      • Electrical safety Audit
      • Hazardous Area Classification Design
      • Lightning Risk Assesesment
      • Thermography
      • Arc Flash Studies
      • Relay coordination Studies
      • EHAZOP / SAFOP
    • Fire Safety
      • Overview
      • Fire Safety Audit
      • Emergency Prepardness
      • Accident Investigation
      • Fire hydrant designing
    • Construction Safety
  • Electrical System Design & Review
    • Overview
    • Load Flow Analysis
    • Fault Level Calculation
    • Relay Coordination
    • Arc flash studies
    • NFPA 70 E Verification
    • EHAZOP / SAFOP
  • Energy and Power Quality
    • End to end solution
    • Infra audit
    • Energy audit
    • Power Quality
  • Safety Engineering Review
    • Lightning protection Design
    • Electrical System design

Lightning Risk Assesesment  Want us to call you

Objective and scope of study:

The objectives and scope of the Lightning & Surge Protection Study are as follows:

  • Review the existing lightening protection system against national and international standards and correction and addition in the system to comply with applicable standards along with risk analysis.
  • Study of maintenance aspects of lightening protection and suggest suitable corrective actions in existing system.
  • Risk analysis & design reports with all as build drawings (as received from client)
  • Reference standards applicable for the premises.

Lightning & Surge Protection Study – Sequence

RISK ASSESSMENT & DESIGN

Technical Scope:

  • Risk Assessment Calculation Considering all elements as described in the IEC 62305 Part 2.
    • Structure Dimension – Collection area calculation
    • Structural Attribute calculations – Wm1, Wm2 & multiple Ks factors
    • Environmental Influences (Line, Location, Ng, TS days etc)
    • Adjacent Structure Contribution factor derivation
    • Power line factors
    • Existing protection measure
    • Loss of human life parameter derivation
  • Selection of areas/buildings/structure/process area with higher probability >1*10e-5
  • Review of existing lightning protection installed for structures & buildings of the plant.
  • Selection of method for external lightning protection

    As per prescribed methods in IS/IEC 62305 Part 3 selection of method shall be done as per the structure and complexity.

    Acceptable methods to be used in determining the position of the air-termination system include:

    • The protection angle method
    • The rolling sphere method
    • The mesh method

    Table 2- of IEC 62305-3


    Maximum value of rolling sphere, radius, mesh size and protection angle corresponding to the class of LPS

    LPS definition shall freeze while on site visit and calculations done.

    A typical structure shall be subjected to desired method as shown below –

    Calculation for the rolling sphere or, mesh shall be shown for the structures used –

    Air termination systems can be composed of any combination of the following elements:

    • Rods (including free-standing masts)
    • Catenary wires
    • Meshed conductor
  • Proposed modification / addition in the existing system to comply with applicable standards with back-up support / calculation for proposed changes.
  • Survey and suggest surge protection for the electronic equipment like DCS / Remote Field instruments / VFDs.
  • Suggest Maintenance practices for the lightning protection system installed / suggested.
  • Provide detailed specification for the equipment needs to be installed for modification.

Lightning protection of Oil Tanks:

Surge Protection

  1. Impulse (1) : 10/350µs of simulated lightning pulse
  2. Impulse (2) : 8/20 µs of simulated overvoltage pulse

Risk assessment together with the determination and application of measures to reduce the risk of damage to structure, services and life hazard should all be considered in order to comply with the requirements of This guide covers the assessment and reduction of risk below tolerable levels, together with techniques for the protection against lightning and touch and step voltages of:

  • * structures, their services, contents and persons within;
  • * services connected to the structure.

Reference Standards

Lightning & Surge Protection is based on the following Standards:-

National Standards:

  • IS 2309 - 2005: Protection of Buildings and Allied Structures Against Lightning.
  • IEC 62305 – 1: Protection against lightning - Part 1: General Principles
  • IEC 62305 – 2: Protection against lightning - Part 2: Risk Management
  • IEC 62305 – 3: Protection against lightning - Part 3: Physical damage to structures and Life
  • IEC 62305 – 4: Protection against lightning - Part 4: Surge Protection of equipment
  • OISD GDN 180: Oil Industry Safety Directorate - Lightning Protection guidelines
  • IS 3043 – 2006: Code of Practice for Earthing (First Revision)
  • IS 7689: Code of Practice against Static Charges

International Standards:

  • NFPA 780 – 2008 : Standard for the installation of Lightning Protection Systems
  • API RP 2003 – American Petroleum Institute – Lightning Protection Standard
  • IEEE 998 – Guide for Direct Lightning Stroke Shielding of Substations

About Us

  • About Sparrow RMS
  • Vision & Mission

Safety & Design Services

  • Safety and Risk Managment
  • Electrical System Design & Review
  • Energy and Power Quality
  • Safety Engineering Review

Detailed Engineering Services

  • Green Field Projects
  • Brown field Projects
  • Merger & Acquisition

Training

  • HSE Induction
  • Arc Flash
  • HAZOP
  • Road Safety Training
  • Accident Investigation
  • Thermography Training

Enquiry & Contacts

Business Query
  • Career
  • Contact
  • Sitemap

© 2015, Sparrow Risk Management Pvt. Ltd. - All Rights

Authorised Business Partner for Flir Thermal Imaging Devices in India