Fire Risk Engineering & Advanced Planning (FREAP™)

Enable life cycle of managinng Gap Assessment to detail Engineering along with CAPEX/OPEX planning upto 5 years. It move the conventionl fire risk Assessment to prove of inplemented solution on glab of bencgmark & links to performance budgting . include deflasation

Planning Flow Chart of FREAP™

  • 1

    Understanding of architectural & Construction design

  • 2

    Process and Utility Understanding

  • 3

    Generation of an Ideal Fire/Explosion Strategy

  • 4

    Site Survey (Qualitative & Quantitative)

  • 8

    Gap Assessment basing Ideal Fire &Explosion Strategy

  • 7

    Optimization of F&E Strategy as per the site conditions

    Basic & Detailed Engineering for gaps (Process & BOP Area)

  • 6

    Goal Setting
    •Short Term
    •Long Term

  • 5

    Sustainable plan Formation
    •Consideration to Future Expansion
    •Production Goals
    •Future modification with optimal resources

  • 5

    Sustainable plan Formation
    •Consideration to Future Expansion
    •Production Goals
    •Future modification with optimal resources

  • 6

    Goal Setting
    •Short Term
    •Long Term

  • 🡄
  • 7

    Optimization of F&E Strategy as per the site conditions

    🡅 🡇

    Basic & Detailed Engineering for gaps (Process & BOP Area)

  • 🡄
  • 8

    Gap Assessment basing Ideal Fire &Explosion Strategy

  • 🡄
  • 9

    Financial Model

FREAP™Key Deliveries

1. Understanding of Architectural Design
  1. Understanding of Architectural Design :
    • Understanding of the plant’s Process Flow

    Process Study & Linkages :

    • Process Flow, Chemical Flow/ Storage, Fire Load, Instrumentation Response Matrix in a variety of scenarios of Fire
2. Fire Strategy
  1. Fire Strategy :

    Preparation of blueprint for Design Basis based on process flow as per point 1 & 2 input criteria, key elements covered:

    • General
    • Design Requirement
    • Process & non Process Fire Scenario
    • Compartmentation
    • Evacuation Planning
    • Structural Component
    • Fire & Evacuation Alarm (Detection System)
    • Fire Suppression System
    • HVAC & Other Air Flow Circuit Impacting Fire Propagation Or Fighting
    • Smoke Management
    • Electrical & Other BOP Fire Risk & Classification (Such as Switch Yards)
3. Site Survey
  1. Site Survey :
    • GAP assessment of site- As per the elements defined in Point 2 (above)

    Deliverables :

    • Fire Risk Assessment Report
4. Discussion & Meeting
  1. Discussion & Meeting :
    • Seeking approval on suggested recommendations from Client & Optimization of Fire Strategy as per the site conditions
5. Design & Modifications
  1. Design & Modifications :

    Calculations

    • Fire Load
    • Pump selection and Water Demand Calculation
    • Pressure drop & Hydraulic calculations
    • Pipenet Hydraulic Simulation (including sprinklers)

    Deliverables :

    • Fire Load Calculation Report
    • Water Demand Calculation Report
    • Pressure Drop and Hydraulic Calculation Report
6. Layout (2D)
  1. Layout (2D) :Updated Drawings & plan with the following markup
    • Master Layout
    • Modified Hydrant Layout
    • Sprinkler Layout
    • Spray System Layout
    • Fire Detection & Alarm System Layout
    • Emergency Evacuation Plan
    • Signages marking on Layout

    Deliverables :

    • Design Drawings and Layouts
7. BOM / BOQ / RFQ
  1. BOM / BOQ / RFQ :
    • Smoke/Fire Detection Elements
    • Smoke/Fire Alarm System Elements
    • Hydrant and Sprinkler Elements
    • Pumps & Standby Elements
    • Cables (Control & Power)
    • Conduits
    • Control Circuitry
    • Accessories

    Deliverables:

    • All formal docs for internal & exteranl consumption
8. Sustainable Plan Formation
  1. Sustainable Plan Formation :

    Preparation

    • System BOQ
    • Project Specifications
    • RFQ (for vendor usage)

    Deliverables :

    • Project BOQ
    • Project Technical Specifications
    • RFQ “Tender Document”
    • Site Progress Reports
    • T&C Reports
9. Cost & Finance Model
    1. Cost & Finance Model :
      • Short term and long-term project plan, sequence and cost model (Opex & Capex)

      Deliverables :

      • Detailed Plan (Including management summary & overview)
10. Optional Studies
  1. Optional Studies :
    • Fire mapping (3D) for flammable storage & explosion risk areas

    Deliverables :

    • Detailed Simulation & BOQ/RFQ
11. Project Closure
  1. Project Closure :
    • Summary…

    Deliverables :

    • Site Handing Over Report
6. Layout (2D)
  1. Layout (2D) :Updated Drawings & plan with the following markup
    • Master Layout
    • Modified Hydrant Layout
    • Sprinkler Layout
    • Spray System Layout
    • Fire Detection & Alarm System Layout
    • Emergency Evacuation Plan
    • Signages marking on Layout

    Deliverables :

    • Design Drawings and Layouts